List of Projects commissioned during FY- 2016-17 Under Grid Connected Rooftop Solar Power Plant scheme
|
S.No. |
Name of developer |
Location |
Date of commissioning |
Total |
1 |
Digambar Singh Bisht |
Pauri |
20-03-18 |
0.500 |
Total= |
0.500 |
District wise details of commissioned projects during FY- 2017-18 under Grid Connected Rooftop Solar Power Plant scheme (Project installed in hilly district of Uttarakhand of capacity 4/5 KWp each, total installed capacity 7.728 MW)
S.No |
District |
Nos of Solar Power Plants |
1 |
Dehradun |
110 |
2 |
Tehri |
248 |
3 |
Uttarkashi |
132 |
4 |
Pauri |
224 |
5 |
Chamoli |
177 |
6 |
Rudraprayag |
138 |
7 |
Pithoragarh |
201 |
8 |
Champawat |
97 |
9 |
Almora |
359 |
10 |
Bageshwar |
120 |
11 |
Nainital |
118 |
Total |
1924 |
List of Projects Commissioned under Generation based Incentive (GBI) Scheme of MNRE, GoI - 5MW during 2011-12
Total 3 Projects of cumulative capacity 5 MW have been commissioned under Generation based Incentive (GBI) scheme of MNRE during 2011-12
S.No. |
Name of Applicant |
District |
Proposed Capacity |
1 |
M/s Jay Ace Technologies |
Haridwar |
2 |
2 |
M/s Metro Frozen Fruits and Vegetables |
Haridwar |
1 |
3 |
M/s RV Akash Ganga Infrastructures P Ltd |
Haridwar |
2 |
Total |
|
5 |
List of projects commissioned in FY 2015-16 allotted through tariff based competitive bidding process (Type-1 of Solar Policy-2013)
Total 12 Projects of cumulative capacity 30 MW have been commissioned in FY 2015-16 which were allotted through tariff based competitive bidding process (Type-1 of Solar Policy)
S.N. |
Name of firm |
Site address |
Capacity in MW |
Lowest Rates (Rs./Unit) |
1 |
M/S Redwoods Projects Pvt.Ltd |
Village Dadajalapur, Haridwar |
2 |
6.85 |
2 |
M/S Advika Energies Energy (P) Ltd. |
Village Chakrola, Chudiyala, Haridwar |
1 |
7.56 |
3 |
M/S Purshotam Industries Ltd. |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
1 |
7.71 |
4 |
M/S Purshotam Industries Ltd. |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
1 |
7.73 |
5 |
M/S Madhav Infra Projects Ltd. |
Village Aamkhedi, near Gagnauli Substation, Haridwar |
12 |
7.74 |
6 |
M/S UJVN Ltd. |
Dhakrani & Khodri, Dehradun |
1.466 |
7.75 |
7 |
M/S UJVN Ltd. |
4.398 |
7.8 |
|
8 |
M/S Purshotam Ispat |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
1 |
7.88 |
9 |
M/S Vivaan Solar Pvt. Ltd. |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
3.5 |
7.93 |
10 |
M/S Purshotam Ispat |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
1 |
7.96 |
11 |
M/S R.C. Energy |
Village Chakrola, Chudiyala, Haridwar |
1 |
7.98 |
12 |
M/S Eastman International |
Village Bishanpur Kundi, Tehsil Jawalapur, Haridwar |
0.636 |
7.99 |
Total |
30 |
List of projects allotted (in FY 2015-16) through tariff based competitive bidding process
(Type-1 of Solar Policy-2013)
Cumulative 181.40 MW capacity of Grid Connected SPV Power projects have been allotted through tariff based competitive bidding Process under Type-1 of Uttarakhand Solar Energy Policy-2013 which will be commissioned by 31st October 2016
S.No. |
Name of the Company |
Capacity MW |
Proposed Location |
1 |
M/s. A.R. Solar Power, Dehradun |
1.00 |
Tuglakpur, Laksar, Haridwar |
2 |
M/s. A.R. Solar Power, Dehradun |
1.00 |
|
3 |
M/s. ACME Solar Holdings Pvt. Ltd, Gurgaon |
12.50 |
Gadarpur Sugar Mill, US Nagar |
4 |
M/s. ACME Solar Holdings Pvt. Ltd, Gurgaon |
12.50 |
Dineshpur, U.S. Nagar |
5 |
M/s. ACME Solar Holdings Pvt. Ltd, Gurgaon |
12.50 |
Bazpur, Rudrapur, U.S. Nagar |
6 |
M/s. ACME Solar Holdings Pvt. Ltd, Gurgaon |
12.50 |
|
7 |
M/s. Emami Power Ltd., Kolkata |
20.00 |
Manglore Roorkee, Haridwar |
8 |
M/s. Hydro Power Engineers, Dehradun |
1.00 |
Tuglakpur, Laksar, Haridwar |
9 |
M/s. Impex India, Kolkata, Kolkata |
2.40 |
Tuglakpur, Laksar, Haridwar |
10 |
M/s. JLTM Energy India Pvt. Ltd., Varanasi |
5.00 |
Kichha, Rudrapur, US Nagar |
11 |
M/s. Makin Developers Pvt. Ltd, Dehradun |
1.00 |
Tuglakpur, Laksar, Haridwar |
12 |
M/s. Omkar PowerTech India Pvt. Ltd., New Delhi |
10.00 |
Chudiyala, Bhagwanpur, Roorkee, Haridwar |
13 |
M/s. Omkar PowerTech India Pvt. Ltd., New Delhi |
10.00 |
|
14 |
M/s. Omkar PowerTech India Pvt. Ltd., New Delhi |
10.00 |
|
15 |
M/s. Profigate Infra Gasoline, Roorkee |
5.00 |
|
16 |
M/s. Profigate Infra Gasoline, Roorkee |
5.00 |
|
17 |
M/s. Rays Power Infra Pvt. Ltd., Jaipur |
10.00 |
|
18 |
M/s. Rays Power Infra Pvt. Ltd., Jaipur |
10.00 |
|
19 |
M/s. Punj Llyod Infrastructure Ltd, Gurgaon |
10.00 |
Gadarpur, US Nagar |
20 |
M/s. Punj Llyod Infrastructure Ltd, Gurgaon |
10.00 |
|
21 |
M/s. Punj Llyod Infrastructure Ltd, Gurgaon |
10.00 |
Gadarpur-1, US Nagar |
22 |
M/s. RP Infrapower Pvt. Ltd., Dehradun |
5.00 |
Tuglakpur, Laksar, Haridwar |
23 |
M/s. Vishal Techno Commerce Ltd., Mumbai |
5.00 |
Gurukul Narsan, Roorkee, Haridwar |
|
|